মেনু নির্বাচন করুন
Text size A A A
Color C C C C
সর্ব-শেষ হাল-নাগাদ: ১৭ সেপ্টেম্বর ২০১৯

সিদ্ধিরগঞ্জ ২x১২০মেঃ ওঃ পিকিং পাওয়ার প্লান্ট

 
Plant Title:
Siddhirganj 2x120 MW Peaking Power Plant
 
Plant Location:
Siddhirganj, Narayanganj.
 
Fuel:
Natural Gas
 
EPC Contract Price:
108.48 Million USD+353.20 Million BDT
 
Financed By:
Asian Development Bank (ADB), GOB.
 
Total Capacity:
211.76 MW (2 x 105.88 MW)
 
EPC Controller:
Bharat Heavy Electricals Limited (BHEL), India.
 
 
 
Name GT-1
Capacity 120
Installation capacity 109
COD 5th February 2012
Fuel type Natural Gas
Manufacturar BHEL
Thermal Efficiency 31% (Appx.)
Site Image
Site Image
Name GT-2
Capacity 100
Installation capacity 111
COD 5th February 2012
Fuel type Natural Gas
Manufacturar BHEL
Thermal Efficiency 31% (Appx.)
Site Image
Site Image
Executive Agency Electricity Generation Company of Bangladesh Ltd.
EGCB Cost 0.00
DPA Cost 77,000.00
GOB Cost 47,563.00
Total Costs 124,563.00
Signing Date 2007-01-31
Configuration 1GT:1GT
Operation Date 2012-02-05
Capacity 211.76 MW (2 x 105.88 MW)
LTSA

14 LTSA Long Term Service Agreement (LTSA) signed on 31-10-2013 for a

period of six (6) years with (1) BHEL, India for Generation and BOP

portion and with (2) BGGTS for CI/HGPI/MI of GT portion.


Share with :